Gates:
Two 20' gates in front, opening to a 40'
entrance off street, one 12' gate in rear at exit from property.
Both with remote openers, key pads, and an electric eye to prevent gate
closing on vehicle entering or leaving: $22,354.50
Sealing and striping the parking lot:
Seal asphalt and stripe off car and truck
parking, install handicap signs, stripe driveway all the way through
property: $6,500.00
30' x 28' Addition on building, turnkey:
The addition will be the warehouse, shipping and receiving area for the ministry, and can house additional offices in the future if needed $35,000.00
Concrete Posts with Chains:
50 posts, 24” round 3’ high with 3' in ground @ $ 375.00 each: $18,750.00
Flag Pole:
Flag -- 8’ x 12’ & 45 ft. Pole installed: $1,200.00
LED Cross:
Single-face Cross, 14’ x 9’ 7’’, red LED, installed, 45’ to top:
$2,200.00
Sign for Building:
One single-face sign for building as per approved sketch, 2’ x 17’
6’’: $1,300.00
Total Project $ 87,304 .50
We have just
learned that we are going to need a new roof on our building. We will
be providing more details regarding the cost when they are available
and update our totals.